Design of an independent pipe system which feeds the MUA ( air conditioning equipment) for its cooling systems, using 6” efficiency pipes, and new chiller’s connection.
This project reduced energy consumption by 30%.
Individual contribution: Water flow calculation, blueprints and professional drawings.